Material requirement planning for build-to-sequence supply: a multi-level optimisation approach

Authors

  • Ágota Bányai University of Miskolc, Faculty of Mechanical Engineering and Informatics, Institute of Logistics, 3515 Miskolc, Hungary

DOI:

https://doi.org/10.24867/JPE-2022-01-025

Keywords:

inventory control, optimization, just-in-sequence supply, lead time

Abstract

Material requirement planning (MRP) plays an important role in the life of production companies, because it has a great impact on the efficiency of manufacturing operations and it influences the total cost. Just-intimeand just-in-sequence supply offer new solutions to improve the cost-efficiency from inventory holding point of view. Within the frame of this article the author focuses on the build-to-sequence strategy of just-in-sequence supply and demonstrate an integrated approach of material requirement planning. The suggested methodology includes the determination of build-to-sequence orders, the optimisation of material requirement from lead time and cost point of view and determine the optimal sequence of operations to fulfil build-to-sequence demands. The computational results show, that the integrated optimisation leads to an increased cost efficiency, while the required manufacturing operations are performed with a decreased lead time.

Published

2023-10-03

Issue

Section

Original Research Article

How to Cite

Material requirement planning for build-to-sequence supply: a multi-level optimisation approach. (2023). Journal of Production Engineering, 25(1), 25-30. https://doi.org/10.24867/JPE-2022-01-025