DELGOSHAEI, Aidin; ARIFFIN, Mohd Khairol; BIN BAHARUDIN, B. T. Hang Tuah; LEMAN, Zulkiflle. A Backward Approach for Maximizing Net Present Value of Multi-mode Pre-emptive Resource-Constrained Project Scheduling Problem with Discounted Cash Flows Using Simulated Annealing Algorithm. International Journal of Industrial Engineering and Management, [S. l.], v. 5, n. 3, p. 151–158, 2014. DOI: 10.24867/IJIEM-2014-3-117. Disponível em: https://sp.ftn.uns.ac.rs/index.php/ijiem/article/view/264. Acesso em: 31 may. 2025.