Wisittipanich, W., & Wisittipanit, N. (2024). Tri-objective parallel machine with job splitting and sequence dependent setup times using differential evolution and particle swarm optimization . International Journal of Industrial Engineering and Management, 15(4), 264–278. https://doi.org/10.24867/IJIEM-2024-4-362