[1]
Delgoshaei, A. et al. 2014. A Backward Approach for Maximizing Net Present Value of Multi-mode Pre-emptive Resource-Constrained Project Scheduling Problem with Discounted Cash Flows Using Simulated Annealing Algorithm. International Journal of Industrial Engineering and Management. 5, 3 (Sep. 2014), 151–158. DOI:https://doi.org/10.24867/IJIEM-2014-3-117.