[1]
Todić, V., Maksimović, R. and Ćosić, I. 2020. Managing target costs at the development stage of a product. Journal of Production Engineering. 23, 2 (Dec. 2020), 7–18. DOI:https://doi.org/10.24867/JPE-2020-02-007.