[1]
Aquere, A.L. and da Cruz Oliveira, C.S.M. 2013. A Study on the Use of Performance Indicators in Project Monitoring of Reinforced Concrete Structures Design. International Journal of Industrial Engineering and Management. 4, 3 (Sep. 2013), 191–198. DOI:https://doi.org/10.24867/IJIEM-2013-3-123.