Location of kit preparation - Impact on in-plant materials supply performance

Published 2011-12-30
abstract views: 25 // FULL TEXT ARTICLE (PDF): 0
Keywords
- Kitting,
- location of kit preparation,
- in-plant materials supply
How to Cite
Copyright (c) 2023 International Journal of Industrial Engineering and Management

This work is licensed under a Creative Commons Attribution 4.0 International License.
Abstract
The current paper aims to determine how the location of kit preparation affects in-plant materials supply performance. To achieve this, three different cases were identified, where principally different locations for kit preparation could be studied and compared: (1) at the assembly line, (2) in the main storage of the assembly plant, and (3) in a separate kit preparation area in-between storage and assembly line. By use of a theoretical framework, developed in the paper, an analysis is made of how the materials supply performance in the cases is linked to the location of the kit preparation.
Article history: Received (10.06.2011); Revised (28.10.2011); Accepted (28.10.2011)